loader
Non scrum black friday bannerNon scrum black friday banner

Explore Categories

Primavera P6 Professional Fundamentals Certification Course

Refer & Earn

Primavera P6 Professional Fundamentals Certification Course in India

Primavera P6 Professional Fundamentals Certification Training

Advance your project scheduling expertise with Primavera P6 Professional Fundamentals

1K+ professionals enrolled in Simpliaxis Primavera P6 Professional Fundamentals training in India

1K+

Enrolled

Google Rating for Primavera P6 Professional Fundamentals

4.8/5

Trustpilot Rating for Primavera P6 Professional Fundamentals

4.8/5

100% Money Back Guarantee
The full amount will be refunded if you are not satisfied with the class within 2 Hours.
Terms and conditions Apply*
  • 3 days of intensive live instructor-led Primavera P6 professional training
  • Gain a detailed understanding of project creation, EPS, OBS, and WBS structuring
  • Learn activity sequencing, relationship types, constraints, and scheduling logic
  • Understand Critical Path Method (CPM) calculations and float analysis
  • Earn 24 PDUs
  • Understand baseline creation, variance tracking, and schedule performance analysis
  • Learn project updating, progress tracking, and forecasting techniques
  • Build expertise in multi-project planning and enterprise data management
Read more...
Want to Train Your Team? Get a Quote
Refer & Earn
Primavera P6 Professional Fundamentals course banner
  • Guaranteed to Run Workshops
  • Expert-Led Study Sessions
  • Networking Opportunities
  • Flexible Monthly Payment Plans
  • Real-World Case Studies
  • Hands-On Project Experience
  • Group/Corporate Training

    Empower teams through training

    skill up your team
    Group/Corporate Training bag icon

    Need guidance? Talk to an expert

    Contact Course Advisor
    Need guidance? Talk to an expert chat icon
    OverviewSchedulesBenefitsCurriculumCorporate TrainingsFAQsReviews
    • 450K+

      Professionals trained

    • 250+

      Workshops every month

    • 20+

      Trainers

    Course Overview

    Oracle Primavera P6 Professional Fundamentals Course Overview

    The Primavera P6 Professional Fundamentals certification by Simpliaxis is a technically intensive training program. It is tailored to effectively build core competencies in enterprise project planning, scheduling, and project controls using Primavera P6 Professional. This course provides a structured understanding of Primavera’s data architecture, including Enterprise Project Structure (EPS), Organizational Breakdown Structure (OBS), calendars, roles, and resource hierarchies. This allows participants to effectively configure and manage complex project environments.

    By the end of the Primavera P6 Professional Fundamentals certification program, participants will be able to develop, analyze, and control completely integrated project schedules. They will also learn to apply Primavera P6 proficiently in large-scale, multi-project environments across industries and sectors.

    What is the Primavera P6 Professional Fundamental Course & Why Is It Important?

    The Primavera P6 Professional Fundamentals Course is a comprehensive training program that helps professionals to gain essential skills in project planning, scheduling, and management using Oracle Primavera P6 Professional software. This course introduces the core modules of the Primavera P6 project management software.

    Participants also learn critical project control techniques, including baseline creation, variance tracking, and earned value analysis. The course also includes hands-on exercises and real-world case studies to help participants develop practical expertise in Critical Path Method (CPM) scheduling, resource allocation, project tracking, and multi-project management.

    A successful completion of the Primavera P6 Professional Fundamentals Course improves the project delivery efficiency and accuracy of participants. For instance, they get the knack for managing complex project timelines, optimizing resources, and ensuring the timely completion of deliverables. 

    Also, the Oracle Primavera P6 Professional Fundamentals training ensures improved career prospects for project managers, planners, schedulers, and engineers. Therefore, this certification course is essential for professionals who look for a significant leap in their careers in the field of project management and enterprise project controls.

    What’s Included in Our Primavera P6 Professional Fundamentals Certification Training Program?

    Our 3-day Primavera P6 Professional Fundamentals course ensures a comprehensive, practical, and career-focused learning experience. This course covers expert-led interactive study sessions, real-world case studies, hands-on project exercises, guaranteed workshops, networking opportunities with peers, and round-the-clock access to learning resources. We also offer flexible payment options so the training is accessible to all professionals who want to advance their careers in project planning, control, and management.

    What Skills Are Covered in the Primavera P6 Professional Fundamentals Certification Course?

    The Primavera P6 Professional Fundamentals certification course training helps participants develop the following skills:

    • Project Structuring
    • Activity Management
    • Scheduling & Forecasting
    • Resource & Cost Management
    • Baseline & Performance Tracking
    • Multi-Project & Enterprise Planning
    • Reporting & Dashboards
    • Hands-On Project Simulations
    • Project Control & Optimization

    What are the Modes of Primavera P6 Professional Fundamentals training online?

    Simpliaxis offers flexible ways of delivering training to help professionals choose the best one that fits their schedule and other commitments. Common modes of training include:

    • Live instructor-led online training: Real-time classes where our expert trainers deliver the training and interact virtually.
    • On-site or corporate group training: Customized sessions delivered at your workplace for teams or business groups.
    • Self-paced e-learning: Pre-recorded video lessons that you can go through and learn as per your convenience.

    Primavera P6 Professional Fundamentals Training Highlights

    What are the Key Highlights of the Primavera P6 Professional Fundamentals Certification Course?

    By enrolling in the Primavera P6 Professional Fundamentals certification training program from Simpliaxis, professionals gain access to the following features:
  • Learn from top-notch industry experts with real-world project experience
  • Participate in live, interactive instructor-led learning sessions
  • Small batch sizes with personalized one-to-one attention
  • Practical reporting, dashboards, and performance monitoring techniques
  • Apply skills through real-world practical exercises and case studies
  • 24/7 access to learning materials and recorded sessions
  • Post-training support and assistance are available anytime
  • Install and practice on non-expiry Primavera P6 v20.12 software
  • Career upliftment

    How to Boost Your Career with the Oracle Primavera P6 Professional Fundamentals Certification?

    What are the Learning Outcomes of the Primavera P6 Professional Fundamentals Certification course?

    By the end of this course, participants will be able to:

    • Build, organize, and manage projects using Primavera P6 Professional by defining Work Breakdown Structures (WBS) and fixing project calendars.
    • Develop comprehensive activity schedules, assign durations, and set up dependencies to define project timelines accurately.
    • Allocate and manage resources, costs, and budgets, and perform resource leveling to improve project execution.
    • Apply Earned Value Management (EVM) techniques to evaluate project performance and the difference between planned and actual progress.
    • Generate and interpret reports, dashboards, S-curves, and histograms to check the status of a project and share key insights with stakeholders.
    • Maintain project baselines, track progress, and use forecasting techniques to support decision-making and ensure projects stay on track.

    Unsure about your prep?

    Primavera P6 Professional Fundamentals Practice Test

    • Immediate Results
    • Sample Papers
    • Time-Limited
    • Comprehensive Explanation
    • Previous Exams

    Benefits focused on Individuals and corporate

    What are the benefits of the Primavera P6 Professional Fundamentals Certification Course?

    Individuals Benefits Individual benefits of Primavera P6 Professional Fundamentals certification illustration
    • Understand Project Scheduling and Controls:Individuals gain advanced skills in planning, scheduling, and managing complex projects using Primavera P6 Professional.

    • Boost Career Growth:Primavera P6 Professional Fundamentals certification improves profiles for project planner, scheduler, and project controls engineer roles.

    • Increase Earning Potential:Certified professionals usually earn higher salaries than their non-certified peers due to their specialized expertise in enterprise project management.

    • Hands-On Experience with Real Projects:Individuals apply their learning through practical exercises and real-world case studies for immediate applicability.

    • Global Industry Recognition:Professionals earn a credential recognized across the IT, pharmaceutical, construction, oil & gas, and infrastructure sectors.

    Corporate Benefits Corporate benefits of Primavera P6 Professional Fundamentals certification illustration
    • Standardized Project Management Practices:Organizations establish uniform planning, scheduling, and control processes across teams and projects to improve coordination and achieve predictable outcomes.

    • Optimized Resource Allocation:Businesses maximize efficiency by effectively assigning certified professionals and budgets across multiple projects to reduce resource conflicts and improve overall project performance.

    • Better Project Visibility and Forecasting: Organizations use accurate progress monitoring, risk analysis, and predictive insights to forecast project outcomes, mitigate delays, and improve decision-making.

    • Improved Team Productivity:Enterprises, with the help of certified professionals, streamline project planning, scheduling, and monitoring to improve team efficiency and ensure the timely delivery of multi-project environments.

    • Enhanced Stakeholder Confidence:Organizations demonstrate strong commitment to project management standards with the help of certified professionals and build trust among clients, investors, and internal stakeholders.

    Common attendees

    Who usually attend Primavera P6 Professional Fundamentals Training

    The Primavera P6 Professional Fundamentals course is suitable for professionals who want to strengthen their expertise in organizational-level project management using Primavera P6. The list of professionals who can attend this course is as follows:​

    • Project Managers & Project Engineers

    • Project Planners & Project Schedulers

    • Cost Engineers & Project Controllers

    • Team Leaders & Department Managers

    • End users

    • Business analysts

    • Functional implementers

    Prerequisites for Primavera P6 Professional Fundamentals certification training

    What are the Eligibility Criteria for the Oracle Primavera P6 Professional Fundamental Certification?

    There are no formal requirements for taking the Primavera P6 Professional Fundamentals course. However, participants who have the following skills will benefit most and grasp the concepts quickly:

    • Fundamental understanding of project management concepts
    • Professionals experience in project planning, scheduling, or project control
    • Familiarity with computer applications and spreadsheets

    Ready for your next professional milestone?

    We’re here to guide you

    Connect With Us
    Simpliaxis advisor discussing career and training options with a professional

    Course Curriculum

    Primavera P6 Professional Fundamentals Certification Course Syllabus in India

    • Overview of Primavera Enterprise
    • Understanding enterprise-level data
    • Understanding project-specific data
    • Introduction to project calendars

    • Overview of Enterprise Project Structure
    • Steps to create a new EPS

    • Introduction to projects in Primavera
    • Procedure for creating a new project

    • Understanding the concept of WBS
    • Steps involved in creating a WBS
    • Adding weighted milestones within WBS

    • Introduction to activities
    • Different types of activities
    • Assigning costs to activities
    • Using activity codes

    • Understanding activity relationships
    • Types of relationships
    • Finish-to-Start (FS) relationship
    • Finish-to-Finish (FF) relationship
    • Start-to-Start (SS) relationship
    • Start-to-Finish (SF) relationship
    • Steps to link activities using relationships

    • Basics of scheduling
    • Performing schedule calculations
    • Understanding automatic scheduling
    • Running automatic scheduling for a project

    • Introduction to constraints
    • Types of constraints in Primavera
    • Steps to assign constraints to activities

    • Overview of reflection projects
    • Process of creating and using reflections
    • Creating a reflection project

    • Grouping and sorting activities
    • Applying filters to activities

    • Introduction to roles
    • Introduction to resources

    • Creating roles
    • Assigning roles to activities

    • Adding resources
    • Assigning resources to activities
    • Modifying columns in the resources tab

    course schedules

    Schedules for Primavera P6 Professional Fundamentals Certification Training in India

    Primavera P6 Professional Fundamentals Certification Training Upcoming Schedules

    • Primavera P6 Professional Fundamentals Certification TrainingNov 30 - Dec 07, 2026 07:00 PM - 11:00 PM (IST) 6 DaysOnlinePrice: INR 79,999
    • Primavera P6 Professional Fundamentals Certification TrainingDec 04 - Dec 06, 2026 08:00 AM - 04:00 PM (IST) 3 DaysOnlinePrice: INR 79,999
    • Primavera P6 Professional Fundamentals Certification TrainingDec 05 - Dec 20, 2026 12:30 PM - 04:30 PM (IST) 6 DaysOnlinePrice: INR 79,999
    • Primavera P6 Professional Fundamentals Certification TrainingDec 12 - Dec 27, 2026 07:00 PM - 11:00 PM (IST) 6 DaysOnlinePrice: INR 79,999
    • Primavera P6 Professional Fundamentals Certification TrainingDec 16 - Dec 18, 2026 08:00 AM - 04:00 PM (IST) 3 DaysOnlinePrice: INR 79,999

    Have more questions or need

    personalized guidance?

    Contact Learning Advisor
    Simpliaxis learning advisors banner

    What you will learn in this Primavera P6 Professional Fundamentals workshop

    What Are the Learning Objectives of the Primavera P6 Professional Fundamentals Certification Course?

    By the end of the Oracle Primavera P6 Professional Fundamentals training program, participants gain expertise to:

    Understand Primavera P6 Software Architecture:

    Learn the structure of Primavera P6, including EPS, OBS, calendars, roles, and resource hierarchies.

    Understand Core Project Planning Concepts:

    Gain basic knowledge of project planning principles, scheduling methods, and the ways to structure projects in enterprise environments.

    Explore Activity and Dependency Management:

    Focus on the principles of activity creation, sequencing, and dependency types to model realistic project schedules.

    Hands-On Practical Exercises:

    Get real-world experience by working on case studies, exercises, and live projects that strengthen your learning process.

    Guaranteed-to-Run Workshops:

    We conduct the training sessions as per the schedule and ensure your learning journey is completely uninterrupted and reliable.

    Real-World Industry Case Studies:

    Our expert trainers use examples from construction, oil & gas, infrastructure, and IT projects throughout the training program to help you understand the practical applications of Primavera P6 Professional.

    24/7 Access to Learning Resources:

    Participants are free to access course materials, relevant videos, and reference guides at any time for continuous learning and revision.

    Post-Training Assistance:

    We provide continuous support even after course completion, so participants can clarify any doubts and improve their project application skills.

    Primavera P6 Professional Fundamentals Certification Course For Corporates

    Why Simpliaxis for Corporates?

    With learning targeted to your unique team environment, we at SimpliAxis help to resolve your specific issues and meet your specific needs with tailored training methods. We offer corporate training globally to keep Organizations up to date by building the knowledge gap required and make them strive in the competitive world with the right skills according to the industry needs.

    • Preferred by many MNC’s, Startups, and Organizations among all sectors.
    • Trusted by X clients and meet their training needs.
    • Skilled training experts and professionals around the world with good command of the subjects.
    • Delivering tailoring modules for your enterprises by highly qualified experts.

    Our Customer words for us

    Take a Look at Our Clients

    Primavera P6 Professional Fundamentals Course FAQs

    Primavera P6 Professional Fundamentals Certification Training FAQs

    The Primavera P6 Professional Fundamentals course is an interactive training program that helps professionals gain knowledge on project planning, scheduling, resource management, and project controls using Oracle Primavera P6 Professional. This course also helps them improve their skills in defining WBS, sequencing activities, tracking progress, and optimizing resources for multi-project environments.

    Professionals such as project managers, planners, schedulers, project controls engineers, cost controllers, etc., are suitable for the Primavera P6 Professional Fundamental course. The training is also ideal for professionals in IT, infrastructure, and construction who seek to improve proficiency in project planning, resource allocation, and performance tracking with Primavera P6.

    There are no formal prerequisites for the Primavera P6 Professional Fundamentals course. However, a fundamental understanding of project management principles and familiarity with applications such as Excel are beneficial for participants. For this reason, both beginners and experienced professionals who want to excel in core project scheduling and understand project control concepts enroll in the course.

    The Primavera P6 Professional Fundamentals training curriculum covers EPS/OBS setup, project creation, calendars, activity coding, dependency types and durations, resource and cost assignments, baseline creation, progress updates, resource leveling, etc. This offers a strong foundation in Primavera P6 scheduling and controls.

    You receive a course completion certificate upon successful completion of the training. This credential validates your proficiency in P6 scheduling and enhances your credibility in roles that require project planning expertise.

    You need basic Excel skills to enroll in the Primavera P6 Professional Fundamentals certification course, but it is not mandatory. A familiarity with spreadsheets will help you import and export data, analyze reports, and improve overall learning efficiency.

    No, there is no official certification exam after completing the Primavera P6 Professional Fundamentals training. Participants usually receive a course completion certificate from the training provider.

    All types of payment methods are available. You can pay Online through Credit Cards, Debit Cards and Net Banking, Direct Bank Transfer/Wire Transfer/Wallet to our account and many more.Other payment options available are stripe, Splitit, PayPal for US & CA regions.

    We accept payments from VISA, Master, Maestro, AMEX, and Discover.

    No, there is no transaction processing fee.

    Upon successful completion of payment, you will receive a confirmation email of your payment along with payment invoices.

    Our refund policy depends on how far in advance the cancellation request is made: More than 7 days before the training: You will receive a 100% refund, less a 10% transaction fee. 3–7 days before the training: You will receive a 50% refund of the amount paid. Within 3 days of the training: No refund will be provided.

    You have the flexibility to pay for the course either in full upfront or in installments, depending on your preference. To know more details about it contact us.

    Yes, we offer discounts and promotions for early payments or certain corporate Training. Keep an eye on our website or contact us to get exciting offers.

    Payments can be made conveniently through our secure online payment portal on our website. We do not require visiting a physical location for payment.

    While we accept payments in various currencies, we recommend using the currency from where you want to attend the course.

    • Token or partial payments will become non-refundable after 15 days from the date of payment.
    • Any token or partial amount paid can be applied towards enrollment for any available sessions on our website within 6 months of the payment date.

    It totally depends upon the course. Please check our website regularly for new offers and discounts throughout the year. You can also chat with one of our career consultants to see if any discounts are available.

    To provide high-quality training and help our professional participants & clients to build a high-performing workforce.

    Simpliaxis offers personalized corporate training programs designed for enterprise teams seeking to refine their employees' skills in various job processes or roles, whether through in-person sessions or live virtual instruction. Led by our skilled and certified trainers, these certification programs not only elevate learning curves but also empower teams to effectively apply their newfound skills to meet industry benchmarks. With over 40 certification programs available, the impact is profound, evident in a remarkable 45% improvement in employee retention rates. On average, there's been a notable 30% enhancement in both work satisfaction and capabilities, showcasing the tangible benefits of our training initiatives.

    Yes, course fees for all technologies are affordable. Along with that, we do provide discounts on various courses.

    You can reach out to our experienced career counselor
    or email us on support@simpliaxis.com
    or contact any of our phone numbers
    or you can chat with us anytime
    or visit our contact us page https://www.simpliaxis.com/contact-us

    Yes, we do provide discounts on multiple courses. Please visit the schedules page to view the available discounts.

    All our trainers are highly qualified and certified, having numerous years of experience in the training industry. You can choose your instructors for your course.

    Yes, we do provide corporate Training. We customize Training based on our clients' needs.

    Yes, For every course, online Training is available.

    We provide different modes of Training: virtual Online Training, Live Virtual Training, Corporate Training & also E-learning.

    At Simpliaxis we provide training for courses of all the in-demand technologies. One can choose a course from Project Management, Agile, IT, DevOps, Business, IT Service Management, Quality Management, etc based on their choice of interest. To know more, please visit https://www.simpliaxis.com/

    Choose the course of your interest, schedule it at your convenience from our upcoming schedule list, and register for the training by submitting your details. Proceed to make a payment and you will receive a confirmation email of your course enrolment. Or you can connect our career advisors to consult & choose your course.

    Yes, you will receive a certificate after successful completion of the training course.

    No, you won't get your money back. But, as per your convenience, we can reschedule your training without any extra charges.

    Yes, you can change the date, but you have to inform it 3-4 days before the Scheduled date.

    Select the course of your interest from the website and view all the upcoming workshop schedules. You can select your course from the website https://www.simpliaxis.com/

    Yes, we’ll be posting multiple schedules every week for all the courses. Based on your convenience, you can select the training schedule. Also, we’ve E-Learning programs for popular courses, you can enroll and watch the training modules whenever you want.

    English is the preferred language for training delivery. For corporate Training, any language other than English will have to be requested as a custom service. However, this will be subject to additional costs and the availability of a native language trainer. Please note that only official languages will be considered for this request.

    If you want to know more about the course you can connect us in mail hello@simpliaxis.com or you can call us.

    Find out why 1,000+ professionals love SimpliAxis

    Why Choose Simpliaxis for the Primavera P6 Professional Fundamentals Certification Training Online?

    Expert-Led Training Sessions

    Learn from our experts, who have years of experience in project planning, scheduling, and project controls using Primavera P6 Professional.

    Structured, Outcome-Focused Curriculum

    We follow a strategically designed syllabus to ensure our participants gain key practical skills and confidence to use Primavera P6 Professional in real-world project planning and scheduling.

    Flexible Learning Options

    Enroll in live online sessions or access recorded materials as per your requirements and convenience without affecting your schedules or professional commitments.

    Hands-On Practical Exercises

    Get real-world experience by working on case studies, exercises, and live projects that strengthen your learning process.

    Guaranteed-to-Run Workshops

    We conduct the training sessions as per the schedule and ensure your learning journey is completely uninterrupted and reliable.

    Real-World Industry Case Studies

    Our expert trainers use examples from construction, oil & gas, infrastructure, and IT projects throughout the training program to help you understand the practical applications of Primavera P6 Professional.

    24/7 Access to Learning Resources

    Participants are free to access course materials, relevant videos, and reference guides at any time for continuous learning and revision.

    Post-Training Assistance

    We provide continuous support even after course completion, so participants can clarify any doubts and improve their project application skills.

    giftbox

    Sharing Knowledge is Rewarding! Earn Big with Every Referral UPTO 60% OFF

    Our privacy policy © 2018-2026, Simpliaxis Solutions Private Limited. All Rights Reserved

    Get coupon upto 60% off

    favcon
    favcon-2