loader
elearning1elearning2

Get 12% Savings on Course Fee Unlock premium knowledge. Build skills that pay

elearning3
elearning3
elearning1

Get 12% Savings on Course Fee Unlock

elearning3

premium knowledge. Build skills that pay

elearning4

12

%

OFF

Claim Coupon coupon-badge

Explore Categories

Certifications
Certified ScrumMaster (CSM) certification badge
2 DaysLive ClassesPopular
Certified Scrum Master (CSM®) Certification
Certified Scrum Product Owner (CSPO) certification badge
2 DaysLive ClassesPopular
Certified Scrum Product Owner (CSPO®) Certification
Certified Scrum Developer (CSD) certification badge
2 DaysLive ClassesPopular
Certified Scrum Developer (CSD®) Certification
1 DaysLive ClassesPopular
Agile and Scrum
PMI Agile Certified Practitioner (PMI-ACP) certification badge
3 DaysLive ClassesPopular
PMI Agile Certified Practitioner (PMI-ACP)® Certification
Professional Scrum Master I (PSM I) certification badge
2 DaysLive ClassesPopular
Professional Scrum Master™ (PSM I) Certification
Certified Agile Service Provider certification badge
2 DaysLive ClassesTrending
Certified Agile Scaling Practitioner 1 (CASP 1)
Certified Agile Facilitator (CAF) certification badge
2 DaysLive ClassesTrending
Agile Coaching Skills - Certified Facilitator (CAF)
Certified Agile Leadership I (CAL 1) certification badge
2 DaysLive ClassesPopular
Certified Agile Leader® 1 (CAL 1™) Certification
3 DaysLive ClassesPopular
ICAgile Certified Professional in Agile Coaching (ICP-ACC®) Certification
Professional Scrum with Kanban (PSK) certification badge
2 DaysLive ClassesPopular
Professional Scrum with Kanban™ (PSK) Certification
Professional Scrum Developer (PSD) certification badge
3 DaysLive ClassesPopular
Professional Scrum Developer (PSD) Certification
Certified Scrum Professional - ScrumMaster (CSP-SM) certification badge
2 DaysLive ClassesPopular
Certified Scrum Professional - ScrumMaster (CSP®-SM) Certification
Certified Agile Leadership II (CAL 2) certification badge
2 DaysLive ClassesTrending
Certified Agile Leader® 2 (CAL 2™) Certification
2 DaysLive Classes
ICAgile Coaching Agile Transformations (ICP-CAT) Certification
Professional Agile Leadership Essentials (PAL-E) certification badge
2 DaysLive Classes
Professional Agile Leadership Essentials™ (PAL-E) Certification
2 DaysLive Classes
Behaviour Driven Development (BDD)
2 DaysLive Classes
Test Driven Development (TDD)
2 DaysLive Classes
ICAgile Agility in the Enterprise (ICP-ENT) Certification
2 DaysLive Classes
ICAgile(ICP) Fundamental Certification
2 DaysLive Classes
Manage Agile Projects Using Scrum
2 DaysLive Classes
Agile for Executives
2 DaysLive Classes
Agile for Managers
2 DaysLive Classes
Agile Product Owner
Applying Professional Scrum (APS) certification badge
2 DaysLive Classes
Applying Professional Scrum™ (APS) Certification
2 DaysLive Classes
Agile Release Planning
2 DaysLive Classes
Agile Project Management
Jira Agile project management tool logo
2 DaysLive ClassesTrending
Jira Software for Agile Projects
ICAgile-ICP-LEA-logo
2 DaysLive Classes
ICAgile Agile Leadership (ICP-LEA) Certification Course
ICAgile Product Management (ICP-PDM) Certification badge
2 DaysLive Classes
ICAgile Product Management (ICP-PDM) Certification
ICAgile ICP-APM logo
2 DaysLive Classes
ICAgile Agile Project & Delivery Management (ICP-APM)
1 DaysLive Classes
Professional Scrum Product Backlog Management (PSPBM) Skills™ Certification Course
ICAgile ICP-APO logo
2 DaysLive Classes
ICAgile Agile Product Ownership (ICP-APO) Certification
APK Course
2 DaysLive Classes
Applying Professional Kanban(APK) Course
ICAgile ICP-ATF Service logo
2 DaysLive Classes
ICAgile Agile Team Facilitation Certification (ICP-ATF)
ICP-FAI course logo
2 DaysLive Classes
ICAgile Foundations of AI (ICP-FAI) Certification
ICAgile ICP-LPM logo
2 DaysLive Classes
ICAgile Lean Portfolio Management (ICP-LPM) Certification
ICAgile ICP-PDM logo
2 DaysLive Classes
ICAgile People Development (ICP-PDV) Certification
ICAgile ICP-SYS logo
2 DaysLive Classes
ICAgile Systems Coaching (ICP-SYS) Certification
ICAgile ICP-BAF logo
2 DaysLive Classes
ICAgile Business Agility Foundations (ICP-BAF) Certification
Professional Scrum Master with AI Skills certification badge
1 DaysLive Classes
Professional Scrum Master AI Essentials Certification
Professional Scrum Product Owner (PSPO) with AI Skills certification badge
1 DaysLive Classes
Professional Scrum Product Owner–AI Essentials (PSPO-AI Essentials) Certification
ICP-ORG Logo
2 DaysLive Classes
ICAgile Adaptive Org Design (ICP-ORG) Certification
Advanced Certifications

SAFe Category

CertificationsAdvanced CertificationsMaster Certifications

Generative AI

View all Courses
Certifications
2 DaysLive Classes
Generative AI for Business & IT Leaders & Managers
2 DaysLive Classes
Generative AI for Business Analysts & Functional IT Consultants
2 DaysLive Classes
Cloud Fundamentals for Business Managers & Product Managers
2 DaysLive Classes
Generative AI Architect - Advanced Program
1 DaysLive Classes
Introduction to Generative AI
2 DaysLive Classes
Generative AI for Agile Leaders
2 DaysLive Classes
Generative AI for Scrum Masters
2 DaysLive Classes
Generative AI in HR Certification Course
2 DaysLive Classes
Generative AI for Software Developers Course
2 DaysLive Classes
Generative AI for Project Managers
2 DaysLive Classes
Prompt Engineering Course
2 DaysLive Classes
Generative AI for Product Owners-Product Managers Certification
2 DaysLive Classes
Mastering Generative AI Tools Online
3 DaysLive Classes
Agentic AI Foundation Course
3 DaysLive Classes
Agentic AI Practitioner Course
11 DaysLive Classes
Claude Certified Architect – Foundations (CCA-F) Course
2 DaysLive ClassesTrending
AI For CXOs Workshop
6 DaysLive ClassesPopular
Agentic AI Engineering with Anthropic Claude Technologies Course
13 DaysLive Classes
Forward Deployed Architect Program
2 DaysLive Classes
AI-Native Development Using BDD
6 DaysLive Classes
Agentic AI with Azure AI Foundry Program
7 DaysLive Classes
Agentic AI for Software Testers Workshop
32 DaysLive Classes
Artificial Intelligence Governance Professional
60 DaysLive Classes
Agentic AI Engineering Workshop
6 DaysLive Classes
Production Grade AI Applications & SDLC Automation with OpenAI Technologies Workshop
5 DaysLive Classes
Agentic AI with AWS Bedrock Workshop
7 DaysLive Classes
AI Engineering with GCP Vertex AI Workshop
24 DaysLive Classes
Agentic and Generative AI Workshop for IT Services Business Leaders & Managers
1 DaysLive Classes
Forward Deployed Engineering Program
1 DaysLive Classes
Business Productivity & Automation with Agentic AI Workshop
1 DaysLive Classes
Agentic AI for Business Transformation Workshop

Primavera P6 Professional Fundamentals Certification Course

Primavera P6 Professional Fundamentals Certification Training

Advance your project scheduling expertise with Primavera P6 Professional Fundamentals

100% Money Back Guarantee
The full amount will be refunded if you are not satisfied with the class within 2 Hours.
Terms and conditions Apply*

1K+ Enrolled

Refer & Earn

  • 3 days of intensive live instructor-led Primavera P6 professional training
  • Gain a detailed understanding of project creation, EPS, OBS, and WBS structuring
  • Learn activity sequencing, relationship types, constraints, and scheduling logic
  • Understand Critical Path Method (CPM) calculations and float analysis
  • Earn 24 PDUs
  • Understand baseline creation, variance tracking, and schedule performance analysis
  • Learn project updating, progress tracking, and forecasting techniques
  • Build expertise in multi-project planning and enterprise data management

Read more...
Refer & Earn

Primavera P6 Professional Fundamentals Certification Course

Refer & Earn

Primavera P6 Professional Fundamentals Certification Course

Primavera P6 Professional Fundamentals Certification Training

Advance your project scheduling expertise with Primavera P6 Professional Fundamentals

1K+

Enrolled

4.9/5

4.9/5

    • 3 days of intensive live instructor-led Primavera P6 professional training
    • Gain a detailed understanding of project creation, EPS, OBS, and WBS structuring
    • Learn activity sequencing, relationship types, constraints, and scheduling logic
    • Understand Critical Path Method (CPM) calculations and float analysis
    • Earn 24 PDUs
    • Understand baseline creation, variance tracking, and schedule performance analysis
    • Learn project updating, progress tracking, and forecasting techniques
    • Build expertise in multi-project planning and enterprise data management

    Read more...

  • 3 days of intensive live instructor-led Primavera P6 professional training
  • Gain a detailed understanding of project creation, EPS, OBS, and WBS structuring
  • Learn activity sequencing, relationship types, constraints, and scheduling logic
  • Understand Critical Path Method (CPM) calculations and float analysis
  • Earn 24 PDUs
  • Understand baseline creation, variance tracking, and schedule performance analysis
  • Learn project updating, progress tracking, and forecasting techniques
  • Build expertise in multi-project planning and enterprise data management

Read more...
Want to Train Your Team? Get a Quote
Refer & Earn

Our combo Deals

  • Loading Combo courses...

Guaranteed to Run Workshops

Expert-Led Study Sessions

Networking Opportunities

Flexible Monthly Payment Plans

Real-World Case Studies

Hands-On Project Experience

Group/Corporate Training

Empower teams through training

skill up your team

Need guidance? Talk to an expert

Contact Course Advisor

600+ Enrolled

OverviewSchedulesBenefitsCurriculumCorporate TrainingsTrainersFAQsReviews
  • 450K+

    Professionals trained

  • 250+

    Workshops every month

  • 20+

    Trainers

Course Overview

Oracle Primavera P6 Professional Fundamentals Course Overview

The Primavera P6 Professional Fundamentals certification by Simpliaxis is a technically intensive training program. It is tailored to effectively build core competencies in enterprise project planning, scheduling, and project controls using Primavera P6 Professional. This course provides a structured understanding of Primavera’s data architecture, including Enterprise Project Structure (EPS), Organizational Breakdown Structure (OBS), calendars, roles, and resource hierarchies. This allows participants to effectively configure and manage complex project environments.

By the end of the Primavera P6 Professional Fundamentals certification program, participants will be able to develop, analyze, and control completely integrated project schedules. They will also learn to apply Primavera P6 proficiently in large-scale, multi-project environments across industries and sectors.

What is the Primavera P6 Professional Fundamental Course & Why Is It Important?

The Primavera P6 Professional Fundamentals Course is a comprehensive training program that helps professionals to gain essential skills in project planning, scheduling, and management using Oracle Primavera P6 Professional software. This course introduces the core modules of the Primavera P6 project management software.

Participants also learn critical project control techniques, including baseline creation, variance tracking, and earned value analysis. The course also includes hands-on exercises and real-world case studies to help participants develop practical expertise in Critical Path Method (CPM) scheduling, resource allocation, project tracking, and multi-project management.

A successful completion of the Primavera P6 Professional Fundamentals Course improves the project delivery efficiency and accuracy of participants. For instance, they get the knack for managing complex project timelines, optimizing resources, and ensuring the timely completion of deliverables. 

Also, the Oracle Primavera P6 Professional Fundamentals training ensures improved career prospects for project managers, planners, schedulers, and engineers. Therefore, this certification course is essential for professionals who look for a significant leap in their careers in the field of project management and enterprise project controls.

What’s Included in Our Primavera P6 Professional Fundamentals Certification Training Program?

Our 3-day Primavera P6 Professional Fundamentals course ensures a comprehensive, practical, and career-focused learning experience. This course covers expert-led interactive study sessions, real-world case studies, hands-on project exercises, guaranteed workshops, networking opportunities with peers, and round-the-clock access to learning resources. We also offer flexible payment options so the training is accessible to all professionals who want to advance their careers in project planning, control, and management.

What Skills Are Covered in the Primavera P6 Professional Fundamentals Certification Course?

The Primavera P6 Professional Fundamentals certification course training helps participants develop the following skills:

  • Project Structuring
  • Activity Management
  • Scheduling & Forecasting
  • Resource & Cost Management
  • Baseline & Performance Tracking
  • Multi-Project & Enterprise Planning
  • Reporting & Dashboards
  • Hands-On Project Simulations
  • Project Control & Optimization

What are the Modes of Primavera P6 Professional Fundamentals training online?

Simpliaxis offers flexible ways of delivering training to help professionals choose the best one that fits their schedule and other commitments. Common modes of training include:

  • Live instructor-led online training: Real-time classes where our expert trainers deliver the training and interact virtually.
  • On-site or corporate group training: Customized sessions delivered at your workplace for teams or business groups.
  • Self-paced e-learning: Pre-recorded video lessons that you can go through and learn as per your convenience.

Primavera P6 Professional Fundamentals Training Highlights

What are the Key Highlights of the Primavera P6 Professional Fundamentals Certification Course?

By enrolling in the Primavera P6 Professional Fundamentals certification training program from Simpliaxis, professionals gain access to the following features:

Learn from top-notch industry experts with real-world project experience

Participate in live, interactive instructor-led learning sessions

Small batch sizes with personalized one-to-one attention

Practical reporting, dashboards, and performance monitoring techniques

Apply skills through real-world practical exercises and case studies

24/7 access to learning materials and recorded sessions

Post-training support and assistance are available anytime

Install and practice on non-expiry Primavera P6 v20.12 software

Career upliftment

How to Boost Your Career with the Oracle Primavera P6 Professional Fundamentals Certification?

What are the Learning Outcomes of the Primavera P6 Professional Fundamentals Certification course?

By the end of this course, participants will be able to:

  • Build, organize, and manage projects using Primavera P6 Professional by defining Work Breakdown Structures (WBS) and fixing project calendars.
  • Develop comprehensive activity schedules, assign durations, and set up dependencies to define project timelines accurately.
  • Allocate and manage resources, costs, and budgets, and perform resource leveling to improve project execution.
  • Apply Earned Value Management (EVM) techniques to evaluate project performance and the difference between planned and actual progress.
  • Generate and interpret reports, dashboards, S-curves, and histograms to check the status of a project and share key insights with stakeholders.
  • Maintain project baselines, track progress, and use forecasting techniques to support decision-making and ensure projects stay on track.

Unsure about your prep?

Primavera P6 Professional Fundamentals Practice Test

  • Immediate Results
  • Sample Papers
  • Time-Limited
  • Comprehensive Explanation
  • Previous Exams

Benefits focused on Individuals and corporate

What are the benefits of the Primavera P6 Professional Fundamentals Certification Course?

Individuals Benefits
    • Understand Project Scheduling and Controls:Individuals gain advanced skills in planning, scheduling, and managing complex projects using Primavera P6 Professional.

    • Boost Career Growth:Primavera P6 Professional Fundamentals certification improves profiles for project planner, scheduler, and project controls engineer roles.

    • Increase Earning Potential:Certified professionals usually earn higher salaries than their non-certified peers due to their specialized expertise in enterprise project management.

    • Hands-On Experience with Real Projects:Individuals apply their learning through practical exercises and real-world case studies for immediate applicability.

    • Global Industry Recognition:Professionals earn a credential recognized across the IT, pharmaceutical, construction, oil & gas, and infrastructure sectors.

Corporate Benefits
    • Standardized Project Management Practices:Organizations establish uniform planning, scheduling, and control processes across teams and projects to improve coordination and achieve predictable outcomes.

    • Optimized Resource Allocation:Businesses maximize efficiency by effectively assigning certified professionals and budgets across multiple projects to reduce resource conflicts and improve overall project performance.

    • Better Project Visibility and Forecasting: Organizations use accurate progress monitoring, risk analysis, and predictive insights to forecast project outcomes, mitigate delays, and improve decision-making.

    • Improved Team Productivity:Enterprises, with the help of certified professionals, streamline project planning, scheduling, and monitoring to improve team efficiency and ensure the timely delivery of multi-project environments.

    • Enhanced Stakeholder Confidence:Organizations demonstrate strong commitment to project management standards with the help of certified professionals and build trust among clients, investors, and internal stakeholders.

Common attendees

Who usually attend Primavera P6 Professional Fundamentals Training

The Primavera P6 Professional Fundamentals course is suitable for professionals who want to strengthen their expertise in organizational-level project management using Primavera P6. The list of professionals who can attend this course is as follows:​

  • Project Managers & Project Engineers

  • Project Planners & Project Schedulers

  • Cost Engineers & Project Controllers

  • Team Leaders & Department Managers

  • End users

  • Business analysts

  • Functional implementers

Prerequisites for Primavera P6 Professional Fundamentals certification training

What are the Eligibility Criteria for the Oracle Primavera P6 Professional Fundamental Certification?

There are no formal requirements for taking the Primavera P6 Professional Fundamentals course. However, participants who have the following skills will benefit most and grasp the concepts quickly:

  • Fundamental understanding of project management concepts
  • Professionals experience in project planning, scheduling, or project control
  • Familiarity with computer applications and spreadsheets

Ready for your next professional milestone?

We’re here to guide you

Connect With Us

Curriculum

Course Curriculum

Primavera P6 Professional Fundamentals Certification Course Syllabus in Australia

  • Overview of Primavera Enterprise
  • Understanding enterprise-level data
  • Understanding project-specific data
  • Introduction to project calendars

  • Overview of Enterprise Project Structure
  • Steps to create a new EPS

  • Introduction to projects in Primavera
  • Procedure for creating a new project

  • Understanding the concept of WBS
  • Steps involved in creating a WBS
  • Adding weighted milestones within WBS

  • Introduction to activities
  • Different types of activities
  • Assigning costs to activities
  • Using activity codes

  • Understanding activity relationships
  • Types of relationships
  • Finish-to-Start (FS) relationship
  • Finish-to-Finish (FF) relationship
  • Start-to-Start (SS) relationship
  • Start-to-Finish (SF) relationship
  • Steps to link activities using relationships

  • Basics of scheduling
  • Performing schedule calculations
  • Understanding automatic scheduling
  • Running automatic scheduling for a project

  • Introduction to constraints
  • Types of constraints in Primavera
  • Steps to assign constraints to activities

  • Overview of reflection projects
  • Process of creating and using reflections
  • Creating a reflection project

  • Grouping and sorting activities
  • Applying filters to activities

  • Introduction to roles
  • Introduction to resources

  • Creating roles
  • Assigning roles to activities

  • Adding resources
  • Assigning resources to activities
  • Modifying columns in the resources tab

Have more questions or need

personalized guidance?

Contact Learning Advisor

What you will learn in this Primavera P6 Professional Fundamentals workshop

What Are the Learning Objectives of the Primavera P6 Professional Fundamentals Certification Course?

By the end of the Oracle Primavera P6 Professional Fundamentals training program, participants gain expertise to:

Understand Primavera P6 Software Architecture:

Learn the structure of Primavera P6, including EPS, OBS, calendars, roles, and resource hierarchies.

Understand Core Project Planning Concepts:

Gain basic knowledge of project planning principles, scheduling methods, and the ways to structure projects in enterprise environments.

Explore Activity and Dependency Management:

Focus on the principles of activity creation, sequencing, and dependency types to model realistic project schedules.

Hands-On Practical Exercises:

Get real-world experience by working on case studies, exercises, and live projects that strengthen your learning process.

Guaranteed-to-Run Workshops:

We conduct the training sessions as per the schedule and ensure your learning journey is completely uninterrupted and reliable.

Real-World Industry Case Studies:

Our expert trainers use examples from construction, oil & gas, infrastructure, and IT projects throughout the training program to help you understand the practical applications of Primavera P6 Professional.

24/7 Access to Learning Resources:

Participants are free to access course materials, relevant videos, and reference guides at any time for continuous learning and revision.

Post-Training Assistance:

We provide continuous support even after course completion, so participants can clarify any doubts and improve their project application skills.

  • 40+ Certification programs made an impact

     
  • Employee retention improved by 45%

  • Work satisfaction and capabilities improved by 30% on an average

100+

Clients

#############

Primavera P6 Professional Fundamentals Certification Course For Corporates

Why Simpliaxis for Corporates?

With learning targeted to your unique team environment, we at SimpliAxis help to resolve your specific issues and meet your specific needs with tailored training methods. We offer corporate training globally to keep Organizations up to date by building the knowledge gap required and make them strive in the competitive world with the right skills according to the industry needs.

  • Preferred by many MNC’s, Startups, and Organizations among all sectors.
  • Trusted by X clients and meet their training needs.
  • Skilled training experts and professionals around the world with good command of the subjects.
  • Delivering tailoring modules for your enterprises by highly qualified experts.

Our Customer words for us

Take a Look at Our Clients

Meet the Team That's Invested in Your Success

Our Primavera P6 Professional Fundamentals Certification Training Trainers

Instructors
View All Trainers

Request more details

By providing your contact details, you agree to our Privacy Policy

Primavera P6 Professional Fundamentals Course FAQs

Primavera P6 Professional Fundamentals Certification Training FAQs

The Primavera P6 Professional Fundamentals course is an interactive training program that helps professionals gain knowledge on project planning, scheduling, resource management, and project controls using Oracle Primavera P6 Professional. This course also helps them improve their skills in defining WBS, sequencing activities, tracking progress, and optimizing resources for multi-project environments.

Professionals such as project managers, planners, schedulers, project controls engineers, cost controllers, etc., are suitable for the Primavera P6 Professional Fundamental course. The training is also ideal for professionals in IT, infrastructure, and construction who seek to improve proficiency in project planning, resource allocation, and performance tracking with Primavera P6.

There are no formal prerequisites for the Primavera P6 Professional Fundamentals course. However, a fundamental understanding of project management principles and familiarity with applications such as Excel are beneficial for participants. For this reason, both beginners and experienced professionals who want to excel in core project scheduling and understand project control concepts enroll in the course.

The Primavera P6 Professional Fundamentals training curriculum covers EPS/OBS setup, project creation, calendars, activity coding, dependency types and durations, resource and cost assignments, baseline creation, progress updates, resource leveling, etc. This offers a strong foundation in Primavera P6 scheduling and controls.

You receive a course completion certificate upon successful completion of the training. This credential validates your proficiency in P6 scheduling and enhances your credibility in roles that require project planning expertise.

You need basic Excel skills to enroll in the Primavera P6 Professional Fundamentals certification course, but it is not mandatory. A familiarity with spreadsheets will help you import and export data, analyze reports, and improve overall learning efficiency.

No, there is no official certification exam after completing the Primavera P6 Professional Fundamentals training. Participants usually receive a course completion certificate from the training provider.

  • Token or partial payments will become non-refundable after 15 days from the date of payment.
  • Any token or partial amount paid can be applied towards enrollment for any available sessions on our website within 6 months of the payment date.

While we accept payments in various currencies, we recommend using the currency from where you want to attend the course.

Payments can be made conveniently through our secure online payment portal on our website. We do not require visiting a physical location for payment.

Yes, we offer discounts and promotions for early payments or certain corporate Training. Keep an eye on our website or contact us to get exciting offers.

You have the flexibility to pay for the course either in full upfront or in installments, depending on your preference. To know more details about it contact us.

No, refund is not possible. You can reschedule your course. To know more about refunds, visit our Refund Policy.

Upon successful completion of payment, you will receive a confirmation email of your payment along with payment invoices.

No, there is no transaction processing fee.

We accept payments from VISA, Master, Maestro, AMEX, and Discover.

All types of payment methods are available. You can pay Online through Credit Cards, Debit Cards and Net Banking, Direct Bank Transfer/Wire Transfer/Wallet to our account and many more.Other payment options available are stripe, Splitit, PayPal for US & CA regions.

No, you won't get your money back. But, as per your convenience, we can reschedule your training without any extra charges.

If you want to know more about the course you can connect us in mail hello@simpliaxis.com or you can call us.

English is the preferred language for training delivery. For corporate Training, any language other than English will have to be requested as a custom service. However, this will be subject to additional costs and the availability of a native language trainer. Please note that only official languages will be considered for this request.

Yes, we’ll be posting multiple schedules every week for all the courses. Based on your convenience, you can select the training schedule. Also, we’ve E-Learning programs for popular courses, you can enroll and watch the training modules whenever you want.

Select the course of your interest from the website and view all the upcoming workshop schedules. You can select your course from the website https://www.simpliaxis.com/

Yes, you can change the date, but you have to inform it 3-4 days before the Scheduled date.

Yes, you will receive a certificate after successful completion of the training course.

Choose the course of your interest, schedule it at your convenience from our upcoming schedule list, and register for the training by submitting your details. Proceed to make a payment and you will receive a confirmation email of your course enrolment. Or you can connect our career advisors to consult & choose your course.

At Simpliaxis we provide training for courses of all the in-demand technologies. One can choose a course from Project Management, Agile, IT, DevOps, Business, IT Service Management, Quality Management, etc based on their choice of interest. To know more, please visit https://www.simpliaxis.com/

We provide different modes of Training: virtual Online Training, Live Virtual Training, Corporate Training & also E-learning.

Yes, For every course, online Training is available.

Yes, we do provide corporate Training. We customize Training based on our clients' needs.

All our trainers are highly qualified and certified, having numerous years of experience in the training industry. You can choose your instructors for your course.

Yes, we do provide discounts on multiple courses. Please visit the schedules page to view the available discounts.

You can reach out to our experienced career counselor
or email us on support@simpliaxis.com
or contact any of our phone numbers
or you can chat with us anytime
or visit our contact us page https://www.simpliaxis.com/contact-us

Yes, course fees for all technologies are affordable. Along with that, we do provide discounts on various courses.

Simpliaxis offers personalized corporate training programs designed for enterprise teams seeking to refine their employees' skills in various job processes or roles, whether through in-person sessions or live virtual instruction. Led by our skilled and certified trainers, these certification programs not only elevate learning curves but also empower teams to effectively apply their newfound skills to meet industry benchmarks. With over 40 certification programs available, the impact is profound, evident in a remarkable 45% improvement in employee retention rates. On average, there's been a notable 30% enhancement in both work satisfaction and capabilities, showcasing the tangible benefits of our training initiatives.

To provide high-quality training and help our professional participants & clients to build a high-performing workforce.

It totally depends upon the course. Please check our website regularly for new offers and discounts throughout the year. You can also chat with one of our career consultants to see if any discounts are available.

Find out why 1,000+ professionals love SimpliAxis

Why Choose Simpliaxis for the Primavera P6 Professional Fundamentals Certification Training Online?

Expert-Led Training Sessions

Learn from our experts, who have years of experience in project planning, scheduling, and project controls using Primavera P6 Professional.

Structured, Outcome-Focused Curriculum

We follow a strategically designed syllabus to ensure our participants gain key practical skills and confidence to use Primavera P6 Professional in real-world project planning and scheduling.

Flexible Learning Options

Enroll in live online sessions or access recorded materials as per your requirements and convenience without affecting your schedules or professional commitments.

Hands-On Practical Exercises

Get real-world experience by working on case studies, exercises, and live projects that strengthen your learning process.

Guaranteed-to-Run Workshops

We conduct the training sessions as per the schedule and ensure your learning journey is completely uninterrupted and reliable.

Real-World Industry Case Studies

Our expert trainers use examples from construction, oil & gas, infrastructure, and IT projects throughout the training program to help you understand the practical applications of Primavera P6 Professional.

24/7 Access to Learning Resources

Participants are free to access course materials, relevant videos, and reference guides at any time for continuous learning and revision.

Post-Training Assistance

We provide continuous support even after course completion, so participants can clarify any doubts and improve their project application skills.

giftbox

Sharing Knowledge is Rewarding! Earn Big with Every Referral UPTO 60% OFF

Our privacy policy © 2018-2026, Simpliaxis Solutions Private Limited. All Rights Reserved

Get coupon upto 60% off

favcon
favcon-2